ARCO is proud to share the completion of a 535,539 SF cross-dock distribution shell at County Line Crossing in Plant City, Florida. This design/build project features concrete tilt-up wall panels, a 7” concrete slab on grade, 36’ clear height, 102 dock positions, four drive-in ramps, an ESFR fire sprinkler system, and a 3000-amp electrical service. The building also includes a spec office buildout and can accommodate multiple future tenant entrances. Check out the completion video…