County Line Progress

3-County-Line

Image 3 of 6

The concrete wall panels have been erected at County Line Crossing in Plant City, FL! ARCO is constructing this 535,134 SF cross-dock speculative warehouse, which features a 7” slab on grade, 36’ clear height, 102 dock positions, and four drive-in ramps.

The concrete wall panels have been erected at County Line Crossing in Plant City, FL! ARCO is constructing this 535,134 SF cross-dock speculative warehouse, which features a 7” slab on grade, 36’ clear height, 102 dock positions, and four drive-in ramps. Check out the progress…