Food Production
85,000 SF Tortilla Production Facility
Orlando, Florida
- Renovated Existing Warehouse into Tortilla Production Facility
- 6,500 SF -10˚F Freezer
- 3,500 SF 40˚F Cooler
- 38,000 SF Production Area
- 24,000 SF Warehouse
- 13,000 SF Office
- Process Utilities, including Compressed Air, Natural Gas, Chilled Water and Hot Water
- Added Two 1,600 AMP Electrical Services
54,400 SF Cannabis Edibles Production Buildout
Tampa, Florida
- Accommodates Commercial Kitchen, Raw Materials Storage, Dry Goods Storage, Cold Storage, Secure Product Storage, Packaging, Distribution, Offices and Maintenance
- Kitchen and Other Food Grade Rooms Contain Washable Ceiling Tiles, Vinyl Protective Wall Panels, Epoxy Floors, and Trench Drains
- Design/Build
32,055 SF CML Bakery
Clearwater, Florida
- 27,255 SF Production Area with Full Wash Down Capabilities
- 4,800 SF Office
- 0°F Freezer
- Installed Production Lines and Equipment for Mixing, Proofing, Frying, Glazing, and Finishing Baked Goods
- Upgraded Utilities for Domestic Water, Sanitary Sewer, Gas, and Electric Service
- 19,600 CFM Kitchen Exhaust Hoods
- 2,250 Gallon Grease Interceptors
- 500 KVA Diesel Generator
31,200 SF Commercial Bakery
Poinciana, Florida
- Accommodates Mixing, Baking, Savory Kitchen, Finished Goods, Dishwashing, Cold Storage, Packaging, Champagne Storage, Warehouse, Shipping, Receiving, and Offices
- Concrete Tilt-Up Wall Panels
- Four 38°F Walk-In Coolers and Two -10°F Walk-In Freezers
- Epoxy Flooring, FRP Panels, Cleanable Ceiling Tiles, and Trench Drains in Commercial Bakery
- Design/Build
44,700 SF Tortilla Production Facility Addition
Atlanta, Georgia
- Accommodates Production, Packaging, Warehouse, 36°F Cold Dock, and Offices
- Coordinate Production Lines and Equipment for Mixing, Bakery, Frying, Seasoning, and Cooling
- Concrete Tilt-Up Wall Panels
- Design/Build
7,640 SF Food Ingredients Spray Dryer Tower
St. Louis, Missouri
- Production Facility for Dry Food Ingredients with Full Wash Down Capabilities
- Explosion-Resistant Insulated Precast Concrete Walls
- 44’ x 55’ Explosion Relief Wall Constructed with Insulated Metal Panels
- 45’ Clear Height
- Four Mezzanine Levels for Equipment Support and Access
Multiple Flavor Facility Projects
Lakeland, Florida
- Building “O” Admin Renovations
- Building “T” QC Lab Addition and Renovations
- Building "U" Compounding Renovations
- Building “Q” Production Building
- Building “W” Shipping and Receiving Renovations
- Building “X” Storage Renovations