Lab and Clean Room
80,000 SF Plastic Manufacturing Facility Buildout
Clearwater, Florida
- 16,400 SF ISO 7 and ISO 8 Clean Rooms for Production
- 24,000 SF Manufacturing
- 30,600 SF Office
- 25,400 SF Warehouse
- Production Area Accommodates Extrusion, Molding, Assembly, Gowning Rooms, and Transfer Rooms
- Design/Build
150,109 SF cGMP Manufacturing Facility
Devens, Massachusetts
- 66,329 SF ISO 7 Clean Rooms
- 39,135 SF Two-Story Office
- 37,020 SF Warehouse
- Concrete Tilt-Up Wall Panels
- Process Piping for Owner Equipment
- Three Electrical Services Totaling 10,500 Amps
136,350 SF Plastic Injection Molding Facility
St. Petersburg, Florida
- 115,300 SF Addition and 21,050 SF Renovation
- 18,200 SF ISO 8 Clean Room for Molding
- 13,500 SF ISO 7 Clean Room for Medical Parts Assembly
- Insulated Concrete Tilt-Up Wall Panels
- Two 500-Ton Air Cooled Chillers for HVAC and Process Water
67,950 SF Laboratory Facility
Olathe, Kansas
- 20,000 SF Biosafety Level II Laboratory Space
- 9,000 SF Freezer and Refrigerator Storage Rooms
- 39,000 SF Office
- Laboratory Gas/Liquid Systems Including Deionized Water, Bulk Liquid Nitrogen, Bulk Nitrogen Gas, and Compressed Air
63,076 SF Medical Tubing Manufacturing Renovation
Oldsmar, Florida
- 7,320 SF ISO 8 Clean Rooms
- Accommodates Extrusion, Expander, Glycol, Accu-Cut, Inspection, Trimming, Flushing, Wire Pulling, Assembly, Lab, Packaging, Maintenance, Shipping, Receiving, Offices, and Training
- Existing Facility Remained Fully Operational During Construction
- Design/Build
Over 100 Clean Room Projects
Tampa, Florida
- 48,000 SF Laboratory and Manufacturing Expansion
- Multiple Clean Room Classifications Ranging from Class A-D and Class 100-100,000
- Clean Rooms Include Storage, Staging, Compounding, Mixing, Fill Suites, Packaging, Scrub, and Gown Rooms
- FDA Certified and EU Certifications
- Process Piping, Including Steam, Clean Steam, Compressed Air, Vacuum, and Process Waste
- Mezzanines for Access and Maintenance
25,000 SF Laboratory and Office
Indianapolis, Indiana
- Five-Phase Laboratory and Corporate Office Remodel in Occupied Space
- Second Story Addition and Exterior Facade Improvements
- 8,000 SF Laboratory Build-Out
- 37°F Cooler and 0°F Freezer in Laboratory
175,500 SF Plastic Injection Molding Facility
St. Petersburg, Florida
- 10,600 SF Clean Environment Assembly
- 5,000 SF Clean Environment Manufacturing
- 16,000 SF Main Manufacturing
- Two 450-Ton Air Cooled Chillers for HVAC and Process Water